Ship ten times a week without Friday-night regressions

AI writes code faster, which means bugs can ship faster too unless the gate is strong. We combine automated Playwright suites, static security checks and senior human sign-off on every release.

QA release gate drawing: every pull request runs deterministic E2E tests, static security scans and semantic QA review to produce an Evidence Pack before a senior engineer signs off on release qa.evidence.blueprint tests · security · semantic · sign-off PULL REQUEST #418 · ISOLATED PREVIEW URL DEPLOYED Triggers 3 parallel verification signals 01 · DETERMINISTIC Playwright E2E 148 / 148 passed GATING ✓ 02 · SECURITY (2×) SAST · CVE · Auth 0 high findings CLEAN ✓ 03 · SEMANTIC Spec intent match Edge cases checked SCORE 0.94 QA EVIDENCE PACK → SENIOR ENGINEER VERDICT (BINDING) AI informs with structured evidence; a named senior engineer signs the release RELEASE APPROVED ✓ CANARY ROLLOUT + 60-SECOND ROLLBACK GUARD Watches error rate & Core Web Vitals for 15 minutes post-deploy

THREE-SIGNAL EVIDENCE PACK

What must pass before any release goes live

Gating · any fail = hard_fail

End-to-end, API contract and regression suites that must pass 100%

Playwright browser flows, API contract checks and database migration tests run on every pull request against an isolated preview environment.

Add this gate to my repo ↗
suite_status: "passed" · passed: 148 · failed: 0 · duration: 94s
Automated test suite and code diff on a developer laptop
Tests that developers actually trust Zero flaky sleeps: deterministic fixtures that run in under two minutes
Manual QA bottleneck?

Still clicking through the site by hand before every deploy?

We automate your ten highest-risk user journeys in Playwright in two to three weeks.

WHAT WE BUILD

Four layers of release confidence

01

Automated E2E and API regression suites

Protect sign-up, checkout, billing and core workflows on every commit.

We write fast, non-flaky Playwright and API test suites around your money-making flows so a Friday CSS tweak can never silently break checkout or login.

PlaywrightVitest / PytestAPI contract testsZero-flake policy
Automate my core tests ↗
02

CI quality gates and preview environments

Every pull request gets its own live URL and evidence pack.

Product managers and clients can click a live preview link on every PR while automated checks verify performance budgets, accessibility and security.

Preview per PRLighthouse CI budgetWCAG checksEvidence pack
Wire CI quality gates ↗
03

Load, stress and chaos testing

Find the breaking point in staging, not on launch day.

We simulate realistic traffic spikes, slow third-party APIs and database failovers using k6 so you know exactly how many concurrent users your system handles.

k6 load testsSpike simulationThird-party timeout testBottleneck report
Load-test my platform ↗
04

Release governance and rollback drills

Staged rollouts, feature flags and a 60-second rollback button.

Every release has a named human sign-off, a canary watch window and a tested one-click rollback, logged inside an immutable release ledger.

Feature flagsCanary watch60s rollbackAudit ledger
Set up release gates ↗

WAYS TO START

Start with your ten highest-risk flows

Stop regressions

Core Flow Test Harness

Put automated Playwright E2E tests around your 10 most critical user journeys.

2 to 3 weeks
  • 10 critical flows in Playwright
  • Wired into GitHub / GitLab CI
  • Slack failure alerts with video trace
  • Handover to your developers
Protect my core flows ↗
Most asked

Full Release Governance Setup

E2E tests, preview environments, security gates and staged release pipelines.

4 to 6 weeks
  • E2E + API contract test suite
  • Preview environment per PR
  • Performance & security CI gates
  • Canary rollout + rollback runbook
Scope release governance ↗
Before launch

Pre-Launch Load & QA Sprint

Hardening sprint before a major product launch, migration or campaign.

2 weeks
  • k6 load & spike testing
  • Cross-browser & mobile device pass
  • Security & permission boundary check
  • Go / no-go readiness report
Book a pre-launch QA sprint ↗

Adjacent disciplines

Test · Verify · Release

Ready to deploy on Friday afternoonwith confidence?

Share your stack and the flows that break most often. We reply with a test plan and fixed scope.